Project Summary At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to advance ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ levels. https://mediasocially.com/story5661403/energy-efficient-400-kw-chiller-installation-delivers-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction